{"id":7405,"date":"2024-08-15T15:24:54","date_gmt":"2024-08-15T08:24:54","guid":{"rendered":"https:\/\/thaipropertynews.com\/feeds\/?p=7405"},"modified":"2024-08-15T15:24:54","modified_gmt":"2024-08-15T08:24:54","slug":"new-energy-storage-solutions-meet-rising-electricity-demand-in-zhejiang","status":"publish","type":"post","link":"https:\/\/thaipropertynews.com\/feeds\/?p=7405","title":{"rendered":"New Energy Storage Solutions Meet Rising Electricity Demand in Zhejiang"},"content":{"rendered":"<p><span class=\"legendSpanClass\"><span class=\"xn-location\">HANGZHOU, China<\/span><\/span>, <span class=\"legendSpanClass\"><span class=\"xn-chron\">Aug. 15, 2024<\/span><\/span> \/PRNewswire\/ &#8212; As temperatures soar, electricity demand continues to climb in <span class=\"xn-location\">Zhejiang Province<\/span>. In mountainous regions of western <span class=\"xn-location\">Zhejiang<\/span>, such as Chun&#8217;an County, numerous photovoltaic projects integrated into the grid in recent years are playing an increasingly vital role in supporting power supply during peak summer demand. Before the summer peak season, the first &#8220;photovoltaic-storage linkage&#8221; 110 kV grid-side energy storage station in western Zhejiang\u2014Hangshi Integrated Energy Technology Chun&#8217;an Energy Storage Station\u2014was connected to the grid at Wenchang Town, Chun&#8217;an County.<\/p>\n<div class=\"PRN_ImbeddedAssetReference\">\n<p> <a href=\"https:\/\/mma.prnasia.com\/media2\/2482815\/image_1.html\" target=\"_blank\" rel=\"noopener\">  <\/a> <br \/><span>New Energy Storage Solutions Meet Rising Electricity Demand in Zhejiang<\/span><\/p>\n<\/div>\n<p>This station is a key project in <span class=\"xn-location\">Zhejiang Province&#8217;s<\/span> &#8220;14th Five-Year&#8221; new energy storage development plan. It features 16 battery prefabrication cabins, 16 PCS boost integration machines, one boost substation, and a comprehensive office building, boasting a maximum charging and discharging power of 50 megawatts and a total storage capacity of 100 megawatt-hours.<\/p>\n<p>State Grid Hangzhou Power Supply Company has proactively planned and prepared for the peak summer period this year. The company strategically chose the site next to the 110 kV Wenchang Substation, located in the high-speed rail ecological industrial park in Wenchang Town, Chun&#8217;an County. This site selection minimized external construction efforts and facilitated an earlier start of operations for the project.<\/p>\n<p>Upon commencement, the station will participate in <span class=\"xn-location\">Zhejiang Province&#8217;s<\/span> electricity market and respond to grid dispatches, playing crucial roles in peak shaving, frequency regulation, emergency backup, and demand response support during the summer. With an energy storage efficiency of 95% and operating on a cycle of two charges and discharges per day, the station is expected to enhance clean energy consumption by 25 million kilowatt-hours annually. This capacity can satisfy the annual electricity needs of about 25,000 households and reduce carbon emissions by 9,000 tons.<\/p>\n<p>\u00a0<\/p>","protected":false},"excerpt":{"rendered":"<p><!-- wp:html --><\/p>\n<p><span class=\"legendSpanClass\"><span class=\"xn-location\">HANGZHOU, China<\/span><\/span>, <span class=\"legendSpanClass\"><span class=\"xn-chron\">Aug. 15, 2024<\/span><\/span> \/PRNewswire\/ &#8212; As temperatures soar, electricity demand continues to climb in <span class=\"xn-location\">Zhejiang Province<\/span>. In mountainous regions of western <span class=\"xn-location\">Zhejiang<\/span>, such as Chun&#8217;an County, numerous photovoltaic projects integrated into the grid in recent years are playing an increasingly vital role in supporting power supply during peak summer demand. Before the summer peak season, the first &#8220;photovoltaic-storage linkage&#8221; 110 kV grid-side energy storage station in western Zhejiang\u2014Hangshi Integrated Energy Technology Chun&#8217;an Energy Storage Station\u2014was connected to the grid at Wenchang Town, Chun&#8217;an County.<\/p>\n<div class=\"PRN_ImbeddedAssetReference\">\n<p> <a href=\"https:\/\/mma.prnasia.com\/media2\/2482815\/image_1.html\" target=\"_blank\" rel=\"noopener\">  <\/a> <br \/><span>New Energy Storage Solutions Meet Rising Electricity Demand in Zhejiang<\/span><\/p>\n<\/div>\n<p>This station is a key project in <span class=\"xn-location\">Zhejiang Province&#8217;s<\/span> &#8220;14th Five-Year&#8221; new energy storage development plan. It features 16 battery prefabrication cabins, 16 PCS boost integration machines, one boost substation, and a comprehensive office building, boasting a maximum charging and discharging power of 50 megawatts and a total storage capacity of 100 megawatt-hours.<\/p>\n<p>State Grid Hangzhou Power Supply Company has proactively planned and prepared for the peak summer period this year. The company strategically chose the site next to the 110 kV Wenchang Substation, located in the high-speed rail ecological industrial park in Wenchang Town, Chun&#8217;an County. This site selection minimized external construction efforts and facilitated an earlier start of operations for the project.<\/p>\n<p>Upon commencement, the station will participate in <span class=\"xn-location\">Zhejiang Province&#8217;s<\/span> electricity market and respond to grid dispatches, playing crucial roles in peak shaving, frequency regulation, emergency backup, and demand response support during the summer. With an energy storage efficiency of 95% and operating on a cycle of two charges and discharges per day, the station is expected to enhance clean energy consumption by 25 million kilowatt-hours annually. This capacity can satisfy the annual electricity needs of about 25,000 households and reduce carbon emissions by 9,000 tons.<\/p>\n<p>\u00a0<\/p>\n<p><!-- \/wp:html --><\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"rop_custom_images_group":[],"rop_custom_messages_group":[],"rop_publish_now":"initial","rop_publish_now_accounts":[],"rop_publish_now_history":[],"rop_publish_now_status":"pending","footnotes":""},"categories":[5,7],"tags":[],"class_list":["post-7405","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-cision-pr-newswire","category-cision-pr-newswire-en"],"_links":{"self":[{"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=\/wp\/v2\/posts\/7405","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=7405"}],"version-history":[{"count":0,"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=\/wp\/v2\/posts\/7405\/revisions"}],"wp:attachment":[{"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=7405"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=7405"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=7405"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}