{"id":46236,"date":"2026-01-27T13:52:00","date_gmt":"2026-01-27T06:52:00","guid":{"rendered":"https:\/\/thaipropertynews.com\/feeds\/?p=46236"},"modified":"2026-01-27T13:52:00","modified_gmt":"2026-01-27T06:52:00","slug":"building-the-backbone-of-smart-pv-manufacturing-skyworth-smart-pv-industrial-park-reaches-structural-topping-out-milestone","status":"publish","type":"post","link":"https:\/\/thaipropertynews.com\/feeds\/?p=46236","title":{"rendered":"Building the Backbone of Smart PV Manufacturing: SKYWORTH Smart PV Industrial Park Reaches Structural Topping-Out Milestone"},"content":{"rendered":"<p><span class=\"legendSpanClass\">SHENZHEN, China<\/span>, <span class=\"legendSpanClass\">Jan. 27, 2026<\/span> \/PRNewswire\/ &#8212; On January 26, 2026, the main structure of the SKYWORTH Smart Photovoltaic Industrial Park was officially topped out in Guangming District, Shenzhen, China. This milestone marks a significant step forward in SKYWORTH&#8217;s long-term strategy within the global renewable energy sector and underscores the company&#8217;s commitment to building a future-oriented photovoltaic industrial ecosystem.<\/p>\n<p>Jointly developed by SKYWORTH PV and SKYWORTH Group Construction &amp; Development, and constructed by China Construction Eighth Engineering Division, the project represents a deep integration of smart manufacturing, green technology, and large-scale industrial planning. It also reflects effective collaboration between enterprise and local government to accelerate the development of advanced manufacturing and sustainable industries.<\/p>\n<p>From the beginning, SKYWORTH Smart PV Industrial Park was designed to go beyond the traditional concept of a manufacturing facility. With a total land area of 63,930.84 m\u00b2 and a planned gross floor area of 318,266.02 m\u00b2, the park includes four factory buildings and a multi-unit dormitory complex, forming a comprehensive and well-structured industrial space. This layout is intended to support technology research, intelligent production, and coordinated development across the photovoltaic value chain.<\/p>\n<p>The topping-out of the main structure is more than a construction milestone\u2014it represents the establishment of a solid physical foundation for SKYWORTH PV&#8217;s next stage of growth. As the park progresses toward completion, it will enable greater systemization and scale in R&amp;D and manufacturing, providing the infrastructure needed to support continuous innovation, higher production efficiency, and long-term capacity expansion.<\/p>\n<p>At the ceremony, <span><\/span><span>Ms. Wanfei Qu<\/span>, CIO of SKYWORTH Group, Director and CEO of SKYWORTH PV,\u00a0outlined the strategic vision behind the project:<\/p>\n<p>&#8220;SKYWORTH PV remains committed to the integrated development model of &#8216;PV + inclusive finance + digital technology.&#8217; The topping-out of the industrial park marks a critical step toward scaled and intelligent development. In the future, this site will serve as a core hub for R&amp;D and manufacturing, and we aim to develop it into a benchmark photovoltaic industrial park for Guangming District, Shenzhen, and the Greater Bay Area in China.&#8221;<\/p>\n<p>Looking ahead, SKYWORTH Smart PV Industrial Park is positioned to become a central engine for the company&#8217;s innovation and manufacturing capabilities. By integrating R&amp;D, production, and supporting facilities within one unified platform, the park will help strengthen supply-chain collaboration, accelerate product iteration, and enhance SKYWORTH PV&#8217;s ability to respond to global market demand.<\/p>\n<p>Once fully completed and operational, the industrial park is expected to contribute meaningfully to regional industrial upgrading, support the development of high-quality renewable energy manufacturing, and reinforce SKYWORTH&#8217;s role in driving the global energy transition.<\/p>","protected":false},"excerpt":{"rendered":"<p><!-- wp:html --><\/p>\n<p><span class=\"legendSpanClass\">SHENZHEN, China<\/span>, <span class=\"legendSpanClass\">Jan. 27, 2026<\/span> \/PRNewswire\/ &#8212; On January 26, 2026, the main structure of the SKYWORTH Smart Photovoltaic Industrial Park was officially topped out in Guangming District, Shenzhen, China. This milestone marks a significant step forward in SKYWORTH&#8217;s long-term strategy within the global renewable energy sector and underscores the company&#8217;s commitment to building a future-oriented photovoltaic industrial ecosystem.<\/p>\n<p>Jointly developed by SKYWORTH PV and SKYWORTH Group Construction &amp; Development, and constructed by China Construction Eighth Engineering Division, the project represents a deep integration of smart manufacturing, green technology, and large-scale industrial planning. It also reflects effective collaboration between enterprise and local government to accelerate the development of advanced manufacturing and sustainable industries.<\/p>\n<p>From the beginning, SKYWORTH Smart PV Industrial Park was designed to go beyond the traditional concept of a manufacturing facility. With a total land area of 63,930.84 m\u00b2 and a planned gross floor area of 318,266.02 m\u00b2, the park includes four factory buildings and a multi-unit dormitory complex, forming a comprehensive and well-structured industrial space. This layout is intended to support technology research, intelligent production, and coordinated development across the photovoltaic value chain.<\/p>\n<p>The topping-out of the main structure is more than a construction milestone\u2014it represents the establishment of a solid physical foundation for SKYWORTH PV&#8217;s next stage of growth. As the park progresses toward completion, it will enable greater systemization and scale in R&amp;D and manufacturing, providing the infrastructure needed to support continuous innovation, higher production efficiency, and long-term capacity expansion.<\/p>\n<p>At the ceremony, <span><\/span><span>Ms. Wanfei Qu<\/span>, CIO of SKYWORTH Group, Director and CEO of SKYWORTH PV,\u00a0outlined the strategic vision behind the project:<\/p>\n<p>&#8220;SKYWORTH PV remains committed to the integrated development model of &#8216;PV + inclusive finance + digital technology.&#8217; The topping-out of the industrial park marks a critical step toward scaled and intelligent development. In the future, this site will serve as a core hub for R&amp;D and manufacturing, and we aim to develop it into a benchmark photovoltaic industrial park for Guangming District, Shenzhen, and the Greater Bay Area in China.&#8221;<\/p>\n<p>Looking ahead, SKYWORTH Smart PV Industrial Park is positioned to become a central engine for the company&#8217;s innovation and manufacturing capabilities. By integrating R&amp;D, production, and supporting facilities within one unified platform, the park will help strengthen supply-chain collaboration, accelerate product iteration, and enhance SKYWORTH PV&#8217;s ability to respond to global market demand.<\/p>\n<p>Once fully completed and operational, the industrial park is expected to contribute meaningfully to regional industrial upgrading, support the development of high-quality renewable energy manufacturing, and reinforce SKYWORTH&#8217;s role in driving the global energy transition.<\/p>\n<p><!-- \/wp:html --><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"rop_custom_images_group":[],"rop_custom_messages_group":[],"rop_publish_now":"initial","rop_publish_now_accounts":[],"rop_publish_now_history":[],"rop_publish_now_status":"pending","footnotes":""},"categories":[1],"tags":[],"class_list":["post-46236","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=\/wp\/v2\/posts\/46236","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=46236"}],"version-history":[{"count":0,"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=\/wp\/v2\/posts\/46236\/revisions"}],"wp:attachment":[{"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=46236"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=46236"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=46236"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}