{"id":42167,"date":"2025-12-19T18:52:00","date_gmt":"2025-12-19T11:52:00","guid":{"rendered":"https:\/\/thaipropertynews.com\/feeds\/?p=42167"},"modified":"2025-12-19T18:52:00","modified_gmt":"2025-12-19T11:52:00","slug":"power-supply-projects-in-shaanxi-fuel-new-development-drive","status":"publish","type":"post","link":"https:\/\/thaipropertynews.com\/feeds\/?p=42167","title":{"rendered":"Power supply projects in Shaanxi fuel new development drive"},"content":{"rendered":"<p><span class=\"legendSpanClass\"><span class=\"xn-location\">BEIJING<\/span><\/span>, <span class=\"legendSpanClass\"><span class=\"xn-chron\">Dec. 19, 2025<\/span><\/span> \/PRNewswire\/ &#8212; A news report from China Daily:\u00a0<\/p>\n<p>Standing on the hills of\u00a0Sixian town in Fuxian county on the Loess Plateau in <span class=\"xn-location\">Shaanxi<\/span> province, one can see the Baota Mountain Converter Station \u2014 the starting point of the State Grid&#8217;s Shaanbei-Anhui 800-kilovolt direct current transmission project.<\/p>\n<div class=\"PRN_ImbeddedAssetReference\">\n<p><a href=\"https:\/\/mma.prnasia.com\/media2\/2849616\/A_view_of_the_Hanzhong_750_kilovolt_power_transmission_and_transformation_project_in_Shaanxi_provinc.html\" target=\"_blank\" rel=\"nofollow\"><img decoding=\"async\" src=\"https:\/\/mma.prnasia.com\/media2\/2849616\/A_view_of_the_Hanzhong_750_kilovolt_power_transmission_and_transformation_project_in_Shaanxi_provinc.jpg?p=medium600\" title=\"A view of the Hanzhong 750-kilovolt power transmission and transformation project in Shaanxi province\" alt=\"A view of the Hanzhong 750-kilovolt power transmission and transformation project in Shaanxi province\" \/><\/a><br \/><span>A view of the Hanzhong 750-kilovolt power transmission and transformation project in Shaanxi province<\/span><\/p>\n<\/div>\n<p>Soon, wind and solar power from northern <span class=\"xn-location\">Shaanxi<\/span> will be transmitted from here to the vast land of the Yangtze-Huaihe River Basin.<\/p>\n<p><b>Converter station on <\/b><b>the Loess Plateau<\/b><\/p>\n<p>In the field of power transmission, converter stations play a crucial role. The\u00a0Baota Mountain Converter Station is sited here not only because new energy resources are scattered across the regions, but also due to its proximity to hubs such as the Yanchang Fuxian Power Plant and Datang Fuxian Power Plant, as well as its adjacency to the 750-kV main power grid, enabling nearby connections and efficient integration of power sources.<\/p>\n<p>Despite the open terrain, the distinctive geological conditions of the Loess Plateau still posed challenges for project construction.<\/p>\n<p>&#8220;The\u00a0Baota Mountain Converter Station is the first ultra-high voltage converter station in <span class=\"xn-location\">China<\/span> built on a Grade-IV collapsible loess foundation. The complex geological conditions make the foundation highly prone to settlement when exposed to rain,&#8221; said <span class=\"xn-person\">Huang Jia<\/span>&#8216;nan, a manager from State Grid Shaanxi Electric Power Company Construction Branch.<\/p>\n<p>To address the collapsible loess, engineers conducted extensive pile tests during the early stages to verify the bearing capacity, stability and structural integrity of the piles and ultimately adopted an innovative foundation treatment method combining compaction piles and cast-in-place piles.<\/p>\n<p>&#8220;This is a key innovation of the project,&#8221;\u00a0Huang added. On this 32-hectare site, construction workers drove a total of 200,000 compaction piles and 10,000 cast-in-place piles, building a solid foundation for the project.<\/p>\n<p>The\u00a0Baota Mountain Converter Station has thus become a model for large-scale converter stations built on Grade-IV collapsible loess. Another important task carried out throughout the construction was 24\/7 sprinkling for dust suppression.<\/p>\n<p>Pointing to an apple orchard not far away,\u00a0Huang said: &#8220;The station site is flat and adjacent to villagers&#8217; apple orchards. During construction, we must strictly avoid environmental and water conservation issues and prevent dust from affecting fruit trees and villagers&#8217; lives.&#8221;<\/p>\n<p>The\u00a0Shaanxi section of the Shaanbei-Anhui 800-kV ultra-high voltage direct current transmission project spans 244.6 kilometers, passing through 10 counties and districts in three cities of Yan&#8217;an, Weinan and Shangluo.<\/p>\n<p>Approximately two-thirds of the project&#8217;s third bid section is located in the hinterland of the\u00a0Qinling Mountains. While ensuring the smooth construction of iron towers, State Grid Shaanxi Electric Power Company Construction Branch performed the protection of green mountains and clear waters throughout the entire process.<\/p>\n<p>&#8220;We erected 59 aerial ropeways to transport materials, allowing the power lines to &#8216;fly&#8217; over the\u00a0Qinling Mountains,&#8221; said He Guangqi, a manager from the transmission project. To minimize environmental disturbance, construction workers often had to hike for several hours to reach the work sites, sometimes ending the day soaked through with sweat.<\/p>\n<p>As an important part of China&#8217;s west-to-east power transmission program, the\u00a0Shaanbei-Anhui 800-kV ultra-high voltage direct current transmission project is <span class=\"xn-location\">Shaanxi&#8217;s<\/span> sixth external power transmission channel. It has a rated transmission capacity of 8 million kilowatts.<\/p>\n<p><b>Transmission lines on the <\/b><b>Qinling Mountains<\/b><\/p>\n<p>In the early morning of <span class=\"xn-chron\">Nov 10<\/span>, the temperature at the construction site of the\u00a0Hanzhong 750-kilovolt power transmission and transformation project dropped to<span> 3\u2103<\/span>. Five construction workers equipped with safety gear climbed the 100-meter-high iron tower under the supervision of a safety officer to carry out accessory installation work.<\/p>\n<p>Some of them were there to determine the installation positions of the accessories, while others passed bolts and hardware fittings to their partners, with each step carried out in an orderly manner. Two hours later, the accessory installation was completed.<\/p>\n<p>The\u00a0Hanzhong 750-kilovolt power transmission and transformation project is a core part of <span class=\"xn-location\">Shaanxi&#8217;s<\/span> main power grid to handle the winter peak. It is also a key project that will integrate the southern <span class=\"xn-location\">Shaanxi<\/span> grid into the main artery of China&#8217;s west-to-east power transmission program.<\/p>\n<p>The project passes through the core area of the\u00a0Qinling Mountains hinterland, with 80 percent of its lines located in mountainous areas 1,200 meters above sea level. Construction workers have to overcome not only technical challenges such as large slopes and long spans between towers, but also complex weather conditions such as low temperatures and dense fog.<\/p>\n<p>Due to the complex terrain, tower materials sometimes need to be transported across river surfaces during project construction. To solve the problem, staff members from State Grid\u00a0Shaanxi Electric Power Company initiated the &#8220;bridge-building&#8221; method by constructing temporary access routes between river banks, which has also mitigated the project&#8217;s effect on the environment.<\/p>\n<p>During construction, the staff members also explored the application of robots. &#8220;Our independently developed &#8216;piercing-eyed elf&#8217; robot has functions such as autonomous walking, obstacle crossing, high-definition photography and adaptive terrain navigation. It can accurately complete the internal inspection of gas-insulated switchgear,&#8221; said\u00a0Wu Xing, a manager at the construction site of the Hanzhong project.<\/p>\n<p>At present, the construction of the project has entered the final stage. After being put into operation, the project will add 4.2 million kilovolt-amperes of substation capacity, which will greatly improve the power supply capacity of southern\u00a0Shaanxi.<\/p>\n<p>Similar difficulties occurred in the\u00a0Ankang 750-kV line project \u2014 the first 750-kV extra-high voltage transmission line in southern <span class=\"xn-location\">Shaanxi<\/span>. It was completed on <span class=\"xn-chron\">Oct 28<\/span>.<\/p>\n<p>The construction, which started in <span class=\"xn-chron\">October 2023<\/span>, has been challenging the limits of human efforts. Known as a &#8220;power line in the air&#8221;, some parts of the line were built on the top of the\u00a0Qinling Mountains.<\/p>\n<p>The core area of the\u00a0Qinling Mountains has steep slopes, crisscrossing gullies and complex geological conditions. The persistent rainy weather in the autumn increased the construction difficulty. Rainstorms accompanied by mudslides frequently hit construction sites. The muddy and slippery mountain roads rendered vehicles unable to move.<\/p>\n<p>&#8220;At the hardest time, we couldn&#8217;t even gather enough people at the construction site,&#8221; said Fu\u00a0Jihang, a team member of the project, when recalling that difficult period.<\/p>\n<p>Since the project was launched, the construction company has conducted multiple on-site investigations and guidance sessions. Various departments closely cooperated with each other. Every step was subject to strict quality and safety control. Finally, the project achieved a &#8220;zero-accident&#8221; record.<\/p>\n<p>Soon, the\u00a0Ankang 750-kV line will light up thousands of households in southern <span class=\"xn-location\">Shaanxi<\/span>, providing strong support for regional industrial upgrading and green development.<\/p>\n<div class=\"PRN_ImbeddedAssetReference\">  <\/div>","protected":false},"excerpt":{"rendered":"<p><!-- wp:html --><\/p>\n<p><span class=\"legendSpanClass\"><span class=\"xn-location\">BEIJING<\/span><\/span>, <span class=\"legendSpanClass\"><span class=\"xn-chron\">Dec. 19, 2025<\/span><\/span> \/PRNewswire\/ &#8212; A news report from China Daily:\u00a0<\/p>\n<p>Standing on the hills of\u00a0Sixian town in Fuxian county on the Loess Plateau in <span class=\"xn-location\">Shaanxi<\/span> province, one can see the Baota Mountain Converter Station \u2014 the starting point of the State Grid&#8217;s Shaanbei-Anhui 800-kilovolt direct current transmission project.<\/p>\n<div class=\"PRN_ImbeddedAssetReference\">\n<p><a href=\"https:\/\/mma.prnasia.com\/media2\/2849616\/A_view_of_the_Hanzhong_750_kilovolt_power_transmission_and_transformation_project_in_Shaanxi_provinc.html\" target=\"_blank\" rel=\"nofollow\"><img decoding=\"async\" src=\"https:\/\/mma.prnasia.com\/media2\/2849616\/A_view_of_the_Hanzhong_750_kilovolt_power_transmission_and_transformation_project_in_Shaanxi_provinc.jpg?p=medium600\" title=\"A view of the Hanzhong 750-kilovolt power transmission and transformation project in Shaanxi province\" alt=\"A view of the Hanzhong 750-kilovolt power transmission and transformation project in Shaanxi province\" \/><\/a><br \/><span>A view of the Hanzhong 750-kilovolt power transmission and transformation project in Shaanxi province<\/span><\/p>\n<\/div>\n<p>Soon, wind and solar power from northern <span class=\"xn-location\">Shaanxi<\/span> will be transmitted from here to the vast land of the Yangtze-Huaihe River Basin.<\/p>\n<p><b>Converter station on <\/b><b>the Loess Plateau<\/b><\/p>\n<p>In the field of power transmission, converter stations play a crucial role. The\u00a0Baota Mountain Converter Station is sited here not only because new energy resources are scattered across the regions, but also due to its proximity to hubs such as the Yanchang Fuxian Power Plant and Datang Fuxian Power Plant, as well as its adjacency to the 750-kV main power grid, enabling nearby connections and efficient integration of power sources.<\/p>\n<p>Despite the open terrain, the distinctive geological conditions of the Loess Plateau still posed challenges for project construction.<\/p>\n<p>&#8220;The\u00a0Baota Mountain Converter Station is the first ultra-high voltage converter station in <span class=\"xn-location\">China<\/span> built on a Grade-IV collapsible loess foundation. The complex geological conditions make the foundation highly prone to settlement when exposed to rain,&#8221; said <span class=\"xn-person\">Huang Jia<\/span>&#8216;nan, a manager from State Grid Shaanxi Electric Power Company Construction Branch.<\/p>\n<p>To address the collapsible loess, engineers conducted extensive pile tests during the early stages to verify the bearing capacity, stability and structural integrity of the piles and ultimately adopted an innovative foundation treatment method combining compaction piles and cast-in-place piles.<\/p>\n<p>&#8220;This is a key innovation of the project,&#8221;\u00a0Huang added. On this 32-hectare site, construction workers drove a total of 200,000 compaction piles and 10,000 cast-in-place piles, building a solid foundation for the project.<\/p>\n<p>The\u00a0Baota Mountain Converter Station has thus become a model for large-scale converter stations built on Grade-IV collapsible loess. Another important task carried out throughout the construction was 24\/7 sprinkling for dust suppression.<\/p>\n<p>Pointing to an apple orchard not far away,\u00a0Huang said: &#8220;The station site is flat and adjacent to villagers&#8217; apple orchards. During construction, we must strictly avoid environmental and water conservation issues and prevent dust from affecting fruit trees and villagers&#8217; lives.&#8221;<\/p>\n<p>The\u00a0Shaanxi section of the Shaanbei-Anhui 800-kV ultra-high voltage direct current transmission project spans 244.6 kilometers, passing through 10 counties and districts in three cities of Yan&#8217;an, Weinan and Shangluo.<\/p>\n<p>Approximately two-thirds of the project&#8217;s third bid section is located in the hinterland of the\u00a0Qinling Mountains. While ensuring the smooth construction of iron towers, State Grid Shaanxi Electric Power Company Construction Branch performed the protection of green mountains and clear waters throughout the entire process.<\/p>\n<p>&#8220;We erected 59 aerial ropeways to transport materials, allowing the power lines to &#8216;fly&#8217; over the\u00a0Qinling Mountains,&#8221; said He Guangqi, a manager from the transmission project. To minimize environmental disturbance, construction workers often had to hike for several hours to reach the work sites, sometimes ending the day soaked through with sweat.<\/p>\n<p>As an important part of China&#8217;s west-to-east power transmission program, the\u00a0Shaanbei-Anhui 800-kV ultra-high voltage direct current transmission project is <span class=\"xn-location\">Shaanxi&#8217;s<\/span> sixth external power transmission channel. It has a rated transmission capacity of 8 million kilowatts.<\/p>\n<p><b>Transmission lines on the <\/b><b>Qinling Mountains<\/b><\/p>\n<p>In the early morning of <span class=\"xn-chron\">Nov 10<\/span>, the temperature at the construction site of the\u00a0Hanzhong 750-kilovolt power transmission and transformation project dropped to<span> 3\u2103<\/span>. Five construction workers equipped with safety gear climbed the 100-meter-high iron tower under the supervision of a safety officer to carry out accessory installation work.<\/p>\n<p>Some of them were there to determine the installation positions of the accessories, while others passed bolts and hardware fittings to their partners, with each step carried out in an orderly manner. Two hours later, the accessory installation was completed.<\/p>\n<p>The\u00a0Hanzhong 750-kilovolt power transmission and transformation project is a core part of <span class=\"xn-location\">Shaanxi&#8217;s<\/span> main power grid to handle the winter peak. It is also a key project that will integrate the southern <span class=\"xn-location\">Shaanxi<\/span> grid into the main artery of China&#8217;s west-to-east power transmission program.<\/p>\n<p>The project passes through the core area of the\u00a0Qinling Mountains hinterland, with 80 percent of its lines located in mountainous areas 1,200 meters above sea level. Construction workers have to overcome not only technical challenges such as large slopes and long spans between towers, but also complex weather conditions such as low temperatures and dense fog.<\/p>\n<p>Due to the complex terrain, tower materials sometimes need to be transported across river surfaces during project construction. To solve the problem, staff members from State Grid\u00a0Shaanxi Electric Power Company initiated the &#8220;bridge-building&#8221; method by constructing temporary access routes between river banks, which has also mitigated the project&#8217;s effect on the environment.<\/p>\n<p>During construction, the staff members also explored the application of robots. &#8220;Our independently developed &#8216;piercing-eyed elf&#8217; robot has functions such as autonomous walking, obstacle crossing, high-definition photography and adaptive terrain navigation. It can accurately complete the internal inspection of gas-insulated switchgear,&#8221; said\u00a0Wu Xing, a manager at the construction site of the Hanzhong project.<\/p>\n<p>At present, the construction of the project has entered the final stage. After being put into operation, the project will add 4.2 million kilovolt-amperes of substation capacity, which will greatly improve the power supply capacity of southern\u00a0Shaanxi.<\/p>\n<p>Similar difficulties occurred in the\u00a0Ankang 750-kV line project \u2014 the first 750-kV extra-high voltage transmission line in southern <span class=\"xn-location\">Shaanxi<\/span>. It was completed on <span class=\"xn-chron\">Oct 28<\/span>.<\/p>\n<p>The construction, which started in <span class=\"xn-chron\">October 2023<\/span>, has been challenging the limits of human efforts. Known as a &#8220;power line in the air&#8221;, some parts of the line were built on the top of the\u00a0Qinling Mountains.<\/p>\n<p>The core area of the\u00a0Qinling Mountains has steep slopes, crisscrossing gullies and complex geological conditions. The persistent rainy weather in the autumn increased the construction difficulty. Rainstorms accompanied by mudslides frequently hit construction sites. The muddy and slippery mountain roads rendered vehicles unable to move.<\/p>\n<p>&#8220;At the hardest time, we couldn&#8217;t even gather enough people at the construction site,&#8221; said Fu\u00a0Jihang, a team member of the project, when recalling that difficult period.<\/p>\n<p>Since the project was launched, the construction company has conducted multiple on-site investigations and guidance sessions. Various departments closely cooperated with each other. Every step was subject to strict quality and safety control. Finally, the project achieved a &#8220;zero-accident&#8221; record.<\/p>\n<p>Soon, the\u00a0Ankang 750-kV line will light up thousands of households in southern <span class=\"xn-location\">Shaanxi<\/span>, providing strong support for regional industrial upgrading and green development.<\/p>\n<div class=\"PRN_ImbeddedAssetReference\">  <\/div>\n<p><!-- \/wp:html --><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"rop_custom_images_group":[],"rop_custom_messages_group":[],"rop_publish_now":"initial","rop_publish_now_accounts":[],"rop_publish_now_history":[],"rop_publish_now_status":"pending","footnotes":""},"categories":[1],"tags":[],"class_list":["post-42167","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=\/wp\/v2\/posts\/42167","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=42167"}],"version-history":[{"count":0,"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=\/wp\/v2\/posts\/42167\/revisions"}],"wp:attachment":[{"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=42167"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=42167"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=42167"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}