{"id":40387,"date":"2025-12-04T12:52:00","date_gmt":"2025-12-04T05:52:00","guid":{"rendered":"https:\/\/thaipropertynews.com\/feeds\/?p=40387"},"modified":"2025-12-04T12:52:00","modified_gmt":"2025-12-04T05:52:00","slug":"sus-environment-leads-uzbekistans-fastest-constructed-waste-to-energy-plant-to-milestone","status":"publish","type":"post","link":"https:\/\/thaipropertynews.com\/feeds\/?p=40387","title":{"rendered":"SUS ENVIRONMENT Leads Uzbekistan&#8217;s Fastest-Constructed Waste-to-Energy Plant to Milestone"},"content":{"rendered":"<table border=\"0\" cellspacing=\"10\" cellpadding=\"5\" align=\"right\">\n<tbody>\n<tr>\n<td><img decoding=\"async\" src=\"https:\/\/mma.prnasia.com\/media2\/2473631\/Logo.jpg?p=medium600\" border=\"0\" alt=\"\" title=\"logo\" hspace=\"0\" vspace=\"0\" width=\"118\" \/><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span class=\"legendSpanClass\"><span class=\"xn-location\">SHANGHAI<\/span><\/span>, <span class=\"legendSpanClass\"><span class=\"xn-chron\">Dec. 4, 2025<\/span><\/span> \/PRNewswire\/ &#8212; On <span class=\"xn-chron\">November 30<\/span>, in\u00a0Karshi City, Kashkadarya Region, <span class=\"xn-location\">Uzbekistan<\/span>, the Kashkadarya Waste-to-Energy Project (hereinafter referred to as the &#8220;Kashkadarya Project&#8221;) by SUS ENVIRONMENT achieved a critical milestone \u2014 the successful hoisting of the first boiler steel frame. The Governor of Kashkadarya Region led representatives from the regional government and environmental protection department to the site, jointly witnessing this significant moment.<\/p>\n<div class=\"PRN_ImbeddedAssetReference\">\n<\/div>\n<p>As one of the first waste-to-energy plants planned in <span class=\"xn-location\">Uzbekistan<\/span>, the Kashkadarya project has efficiently completed all underground and ground foundation works in just three months. It has taken the lead in achieving the milestone of the first boiler steel frame hoisting, marking the comprehensive and high-quality completion of all underground and ground foundation works. The project will now officially transition to the phase of ground facility construction and rapid equipment installation. The President of <span class=\"xn-location\">Uzbekistan<\/span> and the Governor of Kashkadarya Region stated that the government would provide full support for the project&#8217;s construction, expressing their anticipation that it would become <span class=\"xn-location\">Uzbekistan&#8217;s<\/span> first operational waste-to-energy plant.<\/p>\n<p>The Kashkadarya waste-to-energy project is designed to process 502,500 tonnes of municipal solid waste annually, serving a population of over 3 million. It is expected to generate approximately 342 million kilowatt-hours of electricity per year, which can meet the annual electricity demand of more than 170,000 local households. Additionally, the project will reduce greenhouse gas emissions by about 240,000 tonnes annually. Not only will it significantly alleviate the local pressure of &#8220;garbage siege,&#8221; but it will also provide a stable supply of green electricity. This initiative represents an important practice for <span class=\"xn-location\">Uzbekistan<\/span> in promoting energy transition and advancing sustainable development.<\/p>\n<p>Building a Green Belt and Road, Advancing the Clean Energy Transition. The successful progress of the SUS ENVIRONMENT &#8216;s waste-to-energy project will inject strong momentum into the upgrading of the environmental governance system and the low-carbon sustainable development of the entire <span class=\"xn-location\">Central Asia<\/span> region.<\/p>\n<p><b>About SUS ENVIRONMENT<\/b><\/p>\n<p>SUS ENVIRONMENT is the global leading comprehensive environment provider.* As of\u00a0June 2025, SUS ENVIRONMENT has established 11 management centers worldwide, invested in and constructed 90 waste-to-energy projects, with a daily processing capacity nearly 120,000 tonnes of MSW and annual green power generation of approximately 18,000 GWh.<\/p>\n<div>\n<table border=\"0\" cellspacing=\"0\" cellpadding=\"1\" class=\"prnbcc\">\n<tbody>\n<tr>\n<td class=\"prnpr2 prnpl2 prnvab prnsbtb0 prnrbrb0 prnsbbb0 prnsblb0\" colspan=\"1\" rowspan=\"1\">\n<p class=\"prnml4\"><span class=\"prnews_span\">*Data sourced from the Environmental Sanitation Net Of China and public data, covering total design scale, with data as of\u00a0June 30, 2025.<\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/div>\n<p>\u00a0<\/p>","protected":false},"excerpt":{"rendered":"<p><!-- wp:html --><\/p>\n<table border=\"0\" cellspacing=\"10\" cellpadding=\"5\" align=\"right\">\n<tbody>\n<tr>\n<td><img decoding=\"async\" src=\"https:\/\/mma.prnasia.com\/media2\/2473631\/Logo.jpg?p=medium600\" border=\"0\" alt=\"\" title=\"logo\" hspace=\"0\" vspace=\"0\" width=\"118\" \/><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span class=\"legendSpanClass\"><span class=\"xn-location\">SHANGHAI<\/span><\/span>, <span class=\"legendSpanClass\"><span class=\"xn-chron\">Dec. 4, 2025<\/span><\/span> \/PRNewswire\/ &#8212; On <span class=\"xn-chron\">November 30<\/span>, in\u00a0Karshi City, Kashkadarya Region, <span class=\"xn-location\">Uzbekistan<\/span>, the Kashkadarya Waste-to-Energy Project (hereinafter referred to as the &#8220;Kashkadarya Project&#8221;) by SUS ENVIRONMENT achieved a critical milestone \u2014 the successful hoisting of the first boiler steel frame. The Governor of Kashkadarya Region led representatives from the regional government and environmental protection department to the site, jointly witnessing this significant moment.<\/p>\n<div class=\"PRN_ImbeddedAssetReference\">\n<\/div>\n<p>As one of the first waste-to-energy plants planned in <span class=\"xn-location\">Uzbekistan<\/span>, the Kashkadarya project has efficiently completed all underground and ground foundation works in just three months. It has taken the lead in achieving the milestone of the first boiler steel frame hoisting, marking the comprehensive and high-quality completion of all underground and ground foundation works. The project will now officially transition to the phase of ground facility construction and rapid equipment installation. The President of <span class=\"xn-location\">Uzbekistan<\/span> and the Governor of Kashkadarya Region stated that the government would provide full support for the project&#8217;s construction, expressing their anticipation that it would become <span class=\"xn-location\">Uzbekistan&#8217;s<\/span> first operational waste-to-energy plant.<\/p>\n<p>The Kashkadarya waste-to-energy project is designed to process 502,500 tonnes of municipal solid waste annually, serving a population of over 3 million. It is expected to generate approximately 342 million kilowatt-hours of electricity per year, which can meet the annual electricity demand of more than 170,000 local households. Additionally, the project will reduce greenhouse gas emissions by about 240,000 tonnes annually. Not only will it significantly alleviate the local pressure of &#8220;garbage siege,&#8221; but it will also provide a stable supply of green electricity. This initiative represents an important practice for <span class=\"xn-location\">Uzbekistan<\/span> in promoting energy transition and advancing sustainable development.<\/p>\n<p>Building a Green Belt and Road, Advancing the Clean Energy Transition. The successful progress of the SUS ENVIRONMENT &#8216;s waste-to-energy project will inject strong momentum into the upgrading of the environmental governance system and the low-carbon sustainable development of the entire <span class=\"xn-location\">Central Asia<\/span> region.<\/p>\n<p><b>About SUS ENVIRONMENT<\/b><\/p>\n<p>SUS ENVIRONMENT is the global leading comprehensive environment provider.* As of\u00a0June 2025, SUS ENVIRONMENT has established 11 management centers worldwide, invested in and constructed 90 waste-to-energy projects, with a daily processing capacity nearly 120,000 tonnes of MSW and annual green power generation of approximately 18,000 GWh.<\/p>\n<div>\n<table border=\"0\" cellspacing=\"0\" cellpadding=\"1\" class=\"prnbcc\">\n<tbody>\n<tr>\n<td class=\"prnpr2 prnpl2 prnvab prnsbtb0 prnrbrb0 prnsbbb0 prnsblb0\" colspan=\"1\" rowspan=\"1\">\n<p class=\"prnml4\"><span class=\"prnews_span\">*Data sourced from the Environmental Sanitation Net Of China and public data, covering total design scale, with data as of\u00a0June 30, 2025.<\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>\u00a0<\/p>\n<p><!-- \/wp:html --><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"rop_custom_images_group":[],"rop_custom_messages_group":[],"rop_publish_now":"initial","rop_publish_now_accounts":[],"rop_publish_now_history":[],"rop_publish_now_status":"pending","footnotes":""},"categories":[5,7],"tags":[],"class_list":["post-40387","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-cision-pr-newswire","category-cision-pr-newswire-en"],"_links":{"self":[{"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=\/wp\/v2\/posts\/40387","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=40387"}],"version-history":[{"count":0,"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=\/wp\/v2\/posts\/40387\/revisions"}],"wp:attachment":[{"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=40387"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=40387"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=40387"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}