{"id":38983,"date":"2025-11-19T14:04:36","date_gmt":"2025-11-19T07:04:36","guid":{"rendered":"https:\/\/thaipropertynews.com\/feeds\/?p=38983"},"modified":"2025-11-19T14:04:36","modified_gmt":"2025-11-19T07:04:36","slug":"hyperstrong-and-leag-clean-power-sign-an-epc-contract-to-develop-1-6-gwh-battery-energy-storage-project-in-germany-advancing-europes-energy-transition","status":"publish","type":"post","link":"https:\/\/thaipropertynews.com\/feeds\/?p=38983","title":{"rendered":"HyperStrong and LEAG Clean Power Sign an EPC contract to Develop 1.6 GWh Battery Energy Storage Project in Germany, Advancing Europe&#8217;s Energy Transition"},"content":{"rendered":"<table border=\"0\" cellspacing=\"10\" cellpadding=\"5\" align=\"right\">\n<tbody>\n<tr>\n<td><img decoding=\"async\" src=\"https:\/\/mma.prnasia.com\/media2\/2637680\/HyperStrong_updated_Logo_Logo_Logo.jpg?p=medium600\" border=\"0\" alt=\"\" title=\"logo\" hspace=\"0\" vspace=\"0\" width=\"118\" \/><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span class=\"legendSpanClass\">COTTBUS and <span class=\"xn-location\">FRANKFURT, Germany<\/span><\/span>, <span class=\"legendSpanClass\"><span class=\"xn-chron\">Nov. 19, 2025<\/span><\/span> \/PRNewswire\/ &#8212; HyperStrong International (<span class=\"xn-location\">Germany<\/span>) GmbH (HyperStrong), a subsidiary of Beijing HyperStrong Technology Co., LTD. (688411.SH), and LEAG Clean Power GmbH, have signed an EPC (engineering, procurement and construction) contract to deploy a 1.6 GWh utility-scale battery energy storage system (BESS) project in <span class=\"xn-location\">Germany<\/span>. Once completed, this project will become one of the largest battery storage facilities in <span class=\"xn-location\">Europe<\/span>.<\/p>\n<div class=\"PRN_ImbeddedAssetReference\">\n<\/div>\n<p>The new project GigaBattery Boxberg 400 will form part of LEAG&#8217;s GigawattFactory concept \u2013 an integrated renewable energy hub combining photovoltaic and wind generation with flexible storage and hydrogen-ready power plants. The cooperation underscores LEAG&#8217;s commitment to ensuring reliable, sustainable, and secure energy supply for <span class=\"xn-location\">Germany&#8217;s<\/span> future.<\/p>\n<p>The Boxberg project will adopt HyperStrong&#8217;s 4-hour energy storage system, based on its proven HyperBlock III product. HyperBlock III is a mature, field-verified utility-scale storage product designed for stable operation under diverse climatic conditions. The system combines liquid cooling technology, intelligent energy management, and superior safety performance, making it ideal for grid-scale applications in <span class=\"xn-location\">Europe&#8217;s<\/span> variable energy environment. Once operational, the system will provide critical grid services, support renewable integration, and enhance energy security for the region.<\/p>\n<p>&#8220;With this project, we continue to accelerate our GigawattFactory strategy and expand the foundation for a carbon-neutral energy system,&#8221; said <span class=\"xn-person\">Adi Roesch<\/span>, CEO of LEAG Group. &#8220;Battery energy storage plays a crucial role in balancing renewable fluctuations and ensuring energy remains available when it is needed. Working with a technology-driven partner like HyperStrong enables us to deliver on this vision efficiently and at scale.&#8221;<\/p>\n<p>HyperStrong, with the EMEA regional headquarter in <span class=\"xn-location\">Frankfurt, Germany<\/span>, is a Tier-1 global energy storage solution provider with extensive project experience across utility-scale and commercial &amp; industrial applications. The company has deployed over 45 GWh of energy storage systems worldwide across more than 400 projects \u2013 offering high efficiency, safety, and reliability for BESS applications.<\/p>\n<p>For this project, HyperStrong will serve as the EPC contractor, delivering a turnkey, full-station energy storage solution that covers engineering design, equipment supply, system integration, commissioning, grid connection, and long-term operation support.<\/p>\n<p>&#8220;We are honored to partner with LEAG Clean Power on this landmark 1.6 GWh project, which demonstrates both companies&#8217; shared commitment to building a resilient, low-carbon energy future,&#8221; said Dr. <span class=\"xn-person\">Jianhui Zhang<\/span>, Chairman and CEO of HyperStrong. &#8220;This collaboration represents not only a milestone for our global strategy, but also a significant contribution to <span class=\"xn-location\">Germany&#8217;s<\/span> and <span class=\"xn-location\">Europe&#8217;s<\/span> renewable energy transition. Together, we are unlocking the potential of energy storage to power the next era of clean energy.&#8221;<\/p>\n<p>The cooperation between HyperStrong and LEAG Clean Power is part of a broader effort to expand large-scale energy storage capacity in <span class=\"xn-location\">Germany<\/span>. The German government has reaffirmed the strategic importance of storage systems for achieving a secure, affordable, and sustainable electricity system.<\/p>\n<p>&#8220;This partnership brings together complementary strengths \u2013 the energy expertise of LEAG Clean Power and HyperStrong&#8217;s approach to ensure high technical availability and efficiency,&#8221; said <span class=\"xn-person\">Thomas Brandenburg<\/span>, CEO of LEAG Clean Power GmbH. &#8220;The project will set a new milestone for battery storage deployment in <span class=\"xn-location\">Europe<\/span> and demonstrates the growing importance of global collaboration in achieving energy transition goals.&#8221;<\/p>\n<p>Mr. <span class=\"xn-person\">Pingyang Wang<\/span>, Senior Vice President of HyperStrong International and President of EMEA Region, added, &#8220;We are truly honored that LEAG Clean Power has selected HyperStrong as their partner for the Boxberg project. This trust inspires us to bring our full expertise and commitment to deliver a project of the highest quality, while strengthening our long-term presence in <span class=\"xn-location\">Germany<\/span> and supporting the energy transition across <span class=\"xn-location\">Europe<\/span>.&#8221;<\/p>\n<p><b>About HyperStrong <\/b><\/p>\n<p>HyperStrong is a global leading provider of energy storage system solutions. Founded in 2011, with more than 14 years of research and development, as well as experience garnered through more than 400 energy storage projects and 45 GWh of deployment, HyperStrong offers a portfolio of ESS products and one-stop solutions for the full spectrum of utility-scale, commercial and industrial applications. Having built five smart manufacturing bases, three R&amp;D centers, two testing labs and a global marketing center, HyperStrong empowers clients worldwide to achieve their energy transition and carbon neutrality goals.<\/p>\n<p>For more information about HyperStrong, visit: <a href=\"http:\/\/www.hyperstrong.com\/\" target=\"_blank\" rel=\"nofollow\">www.hyperstrong.com<\/a> or follow us on <a href=\"https:\/\/www.linkedin.com\/company\/hyperstrong\/?viewAsMember=true\" target=\"_blank\" rel=\"nofollow\">LinkedIn<\/a>.<\/p>\n<p><b>About LEAG Clean Power<\/b><\/p>\n<p>LEAG Clean Power GmbH is part of the LEAG Group, <span class=\"xn-location\">Germany&#8217;s<\/span> second-largest electricity producer and one of the largest private employers in eastern <span class=\"xn-location\">Germany<\/span>. LEAG Clean Power GmbH focuses its business activities on projects in the areas of battery storage and innovative power plants, thereby making a decisive contribution to the development of the LEAG GigawattFactory. With investments in the expansion of renewable energies, storage capacities, the construction of hydrogen-compatible gas-fired power plants and energy generation from biomass, the LEAG Group is consistently driving forward its transformation from a conventional energy supplier to a future-oriented energy transition company.<\/p>\n<p>For further information, please visit\u00a0<a href=\"https:\/\/www.leag.de\/en\/gigawattfactory\/\" target=\"_blank\" rel=\"nofollow\">GigawattFactory | LEAG<\/a>\u00a0or follow us on\u00a0<a href=\"https:\/\/www.globenewswire.com\/Tracker?data=4OAz4FqPDOpXPaL8ZcRcVG-blTn7HsMh8ax_3xXAzWiIntksitQgFWC9dAbnq7Pm8I2QA7XhTsiGAm7ilakoF-egIhfaf27nJ_e6IABHVhiCAJRYWh5tZz2mzDTing10\" target=\"_blank\" rel=\"nofollow\">LEAG | LinkedIn<\/a>.\u00a0<\/p>","protected":false},"excerpt":{"rendered":"<p><!-- wp:html --><\/p>\n<table border=\"0\" cellspacing=\"10\" cellpadding=\"5\" align=\"right\">\n<tbody>\n<tr>\n<td><img decoding=\"async\" src=\"https:\/\/mma.prnasia.com\/media2\/2637680\/HyperStrong_updated_Logo_Logo_Logo.jpg?p=medium600\" border=\"0\" alt=\"\" title=\"logo\" hspace=\"0\" vspace=\"0\" width=\"118\" \/><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span class=\"legendSpanClass\">COTTBUS and <span class=\"xn-location\">FRANKFURT, Germany<\/span><\/span>, <span class=\"legendSpanClass\"><span class=\"xn-chron\">Nov. 19, 2025<\/span><\/span> \/PRNewswire\/ &#8212; HyperStrong International (<span class=\"xn-location\">Germany<\/span>) GmbH (HyperStrong), a subsidiary of Beijing HyperStrong Technology Co., LTD. (688411.SH), and LEAG Clean Power GmbH, have signed an EPC (engineering, procurement and construction) contract to deploy a 1.6 GWh utility-scale battery energy storage system (BESS) project in <span class=\"xn-location\">Germany<\/span>. Once completed, this project will become one of the largest battery storage facilities in <span class=\"xn-location\">Europe<\/span>.<\/p>\n<div class=\"PRN_ImbeddedAssetReference\">\n<\/div>\n<p>The new project GigaBattery Boxberg 400 will form part of LEAG&#8217;s GigawattFactory concept \u2013 an integrated renewable energy hub combining photovoltaic and wind generation with flexible storage and hydrogen-ready power plants. The cooperation underscores LEAG&#8217;s commitment to ensuring reliable, sustainable, and secure energy supply for <span class=\"xn-location\">Germany&#8217;s<\/span> future.<\/p>\n<p>The Boxberg project will adopt HyperStrong&#8217;s 4-hour energy storage system, based on its proven HyperBlock III product. HyperBlock III is a mature, field-verified utility-scale storage product designed for stable operation under diverse climatic conditions. The system combines liquid cooling technology, intelligent energy management, and superior safety performance, making it ideal for grid-scale applications in <span class=\"xn-location\">Europe&#8217;s<\/span> variable energy environment. Once operational, the system will provide critical grid services, support renewable integration, and enhance energy security for the region.<\/p>\n<p>&#8220;With this project, we continue to accelerate our GigawattFactory strategy and expand the foundation for a carbon-neutral energy system,&#8221; said <span class=\"xn-person\">Adi Roesch<\/span>, CEO of LEAG Group. &#8220;Battery energy storage plays a crucial role in balancing renewable fluctuations and ensuring energy remains available when it is needed. Working with a technology-driven partner like HyperStrong enables us to deliver on this vision efficiently and at scale.&#8221;<\/p>\n<p>HyperStrong, with the EMEA regional headquarter in <span class=\"xn-location\">Frankfurt, Germany<\/span>, is a Tier-1 global energy storage solution provider with extensive project experience across utility-scale and commercial &amp; industrial applications. The company has deployed over 45 GWh of energy storage systems worldwide across more than 400 projects \u2013 offering high efficiency, safety, and reliability for BESS applications.<\/p>\n<p>For this project, HyperStrong will serve as the EPC contractor, delivering a turnkey, full-station energy storage solution that covers engineering design, equipment supply, system integration, commissioning, grid connection, and long-term operation support.<\/p>\n<p>&#8220;We are honored to partner with LEAG Clean Power on this landmark 1.6 GWh project, which demonstrates both companies&#8217; shared commitment to building a resilient, low-carbon energy future,&#8221; said Dr. <span class=\"xn-person\">Jianhui Zhang<\/span>, Chairman and CEO of HyperStrong. &#8220;This collaboration represents not only a milestone for our global strategy, but also a significant contribution to <span class=\"xn-location\">Germany&#8217;s<\/span> and <span class=\"xn-location\">Europe&#8217;s<\/span> renewable energy transition. Together, we are unlocking the potential of energy storage to power the next era of clean energy.&#8221;<\/p>\n<p>The cooperation between HyperStrong and LEAG Clean Power is part of a broader effort to expand large-scale energy storage capacity in <span class=\"xn-location\">Germany<\/span>. The German government has reaffirmed the strategic importance of storage systems for achieving a secure, affordable, and sustainable electricity system.<\/p>\n<p>&#8220;This partnership brings together complementary strengths \u2013 the energy expertise of LEAG Clean Power and HyperStrong&#8217;s approach to ensure high technical availability and efficiency,&#8221; said <span class=\"xn-person\">Thomas Brandenburg<\/span>, CEO of LEAG Clean Power GmbH. &#8220;The project will set a new milestone for battery storage deployment in <span class=\"xn-location\">Europe<\/span> and demonstrates the growing importance of global collaboration in achieving energy transition goals.&#8221;<\/p>\n<p>Mr. <span class=\"xn-person\">Pingyang Wang<\/span>, Senior Vice President of HyperStrong International and President of EMEA Region, added, &#8220;We are truly honored that LEAG Clean Power has selected HyperStrong as their partner for the Boxberg project. This trust inspires us to bring our full expertise and commitment to deliver a project of the highest quality, while strengthening our long-term presence in <span class=\"xn-location\">Germany<\/span> and supporting the energy transition across <span class=\"xn-location\">Europe<\/span>.&#8221;<\/p>\n<p><b>About HyperStrong <\/b><\/p>\n<p>HyperStrong is a global leading provider of energy storage system solutions. Founded in 2011, with more than 14 years of research and development, as well as experience garnered through more than 400 energy storage projects and 45 GWh of deployment, HyperStrong offers a portfolio of ESS products and one-stop solutions for the full spectrum of utility-scale, commercial and industrial applications. Having built five smart manufacturing bases, three R&amp;D centers, two testing labs and a global marketing center, HyperStrong empowers clients worldwide to achieve their energy transition and carbon neutrality goals.<\/p>\n<p>For more information about HyperStrong, visit: <a href=\"http:\/\/www.hyperstrong.com\/\" target=\"_blank\" rel=\"nofollow\">www.hyperstrong.com<\/a> or follow us on <a href=\"https:\/\/www.linkedin.com\/company\/hyperstrong\/?viewAsMember=true\" target=\"_blank\" rel=\"nofollow\">LinkedIn<\/a>.<\/p>\n<p><b>About LEAG Clean Power<\/b><\/p>\n<p>LEAG Clean Power GmbH is part of the LEAG Group, <span class=\"xn-location\">Germany&#8217;s<\/span> second-largest electricity producer and one of the largest private employers in eastern <span class=\"xn-location\">Germany<\/span>. LEAG Clean Power GmbH focuses its business activities on projects in the areas of battery storage and innovative power plants, thereby making a decisive contribution to the development of the LEAG GigawattFactory. With investments in the expansion of renewable energies, storage capacities, the construction of hydrogen-compatible gas-fired power plants and energy generation from biomass, the LEAG Group is consistently driving forward its transformation from a conventional energy supplier to a future-oriented energy transition company.<\/p>\n<p>For further information, please visit\u00a0<a href=\"https:\/\/www.leag.de\/en\/gigawattfactory\/\" target=\"_blank\" rel=\"nofollow\">GigawattFactory | LEAG<\/a>\u00a0or follow us on\u00a0<a href=\"https:\/\/www.globenewswire.com\/Tracker?data=4OAz4FqPDOpXPaL8ZcRcVG-blTn7HsMh8ax_3xXAzWiIntksitQgFWC9dAbnq7Pm8I2QA7XhTsiGAm7ilakoF-egIhfaf27nJ_e6IABHVhiCAJRYWh5tZz2mzDTing10\" target=\"_blank\" rel=\"nofollow\">LEAG | LinkedIn<\/a>.\u00a0<\/p>\n<p><!-- \/wp:html --><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"rop_custom_images_group":[],"rop_custom_messages_group":[],"rop_publish_now":"initial","rop_publish_now_accounts":[],"rop_publish_now_history":[],"rop_publish_now_status":"pending","footnotes":""},"categories":[5,7],"tags":[],"class_list":["post-38983","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-cision-pr-newswire","category-cision-pr-newswire-en"],"_links":{"self":[{"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=\/wp\/v2\/posts\/38983","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=38983"}],"version-history":[{"count":0,"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=\/wp\/v2\/posts\/38983\/revisions"}],"wp:attachment":[{"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=38983"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=38983"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=38983"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}