{"id":19801,"date":"2025-03-13T08:15:44","date_gmt":"2025-03-13T08:15:44","guid":{"rendered":"https:\/\/www.hotelsalepage.com\/feed\/cision-pr-newswire\/state-grid-kashgar-power-supply-company-electrification-drives-desert-ecological-transformation\/"},"modified":"2025-03-13T08:15:44","modified_gmt":"2025-03-13T08:15:44","slug":"state-grid-kashgar-power-supply-company-electrification-drives-desert-ecological-transformation","status":"publish","type":"post","link":"https:\/\/thaipropertynews.com\/feeds\/?p=19801","title":{"rendered":"State Grid Kashgar Power Supply Company: Electrification Drives Desert Ecological Transformation"},"content":{"rendered":"<p><span class=\"legendSpanClass\">KASHGAR, <span class=\"xn-location\">China<\/span><\/span>, <span class=\"legendSpanClass\"><span class=\"xn-chron\">March 13, 2025<\/span><\/span> \/PRNewswire\/ &#8212; On <span class=\"xn-chron\">March 11<\/span>, the successful\u00a0energization of the final transformer for the Dawakun Desert Comprehensive Control Project in Yuepuhu County marked a significant milestone. The State Grid Kashgar Power Supply Company successfully completed the installation of 101 transformers with a capacity of 100 kVA each and constructed 128 kilometers of dedicated transmission lines, providing reliable power supply to 96 pumping wells. This achievement signifies key progress in the Southern Xinjiang &#8220;Sand Stabilization and Border Security&#8221; initiative.<\/p>\n<p>The large-scale sand stabilization project, situated at the border between the Dawakun Desert and Buguri Desert, commenced on <span class=\"xn-chron\">January 15<\/span>. It aims to establish ecological barriers through the construction of water-saving drip irrigation systems and the planting of drought-resistant vegetation such as Haloxylon ammodendron. The State Grid Kashgar Power Supply Company proactively aligned with government planning by forming a specialized task force to conduct preliminary investigations and tailor-made power supply solutions. A green channel was established for the entire project process, enabling same-day power delivery upon acceptance. According to <span class=\"xn-person\">Jiang Xiao<\/span>, Deputy Director of the Power Supply Department at State Grid Yuepuhu County Power Supply Company, an exclusive personnel tracking mechanism reduced the construction approval process by 60%, ensuring simultaneous advancement of sand control efforts and power infrastructure development.<\/p>\n<p>The integration of ecological governance and economic benefits has emerged as a highlight of the project. After 1-2 years of sand stabilization, the value of the desert ecosystem can be enhanced by grafting the valuable herb Cistanche onto the roots of existing plants. Each household contracts 30-50 mu of land, contributing to both sand control and income generation. Villager Ulaimu Tohti from <span class=\"xn-person\">Bayi Awati<\/span> village noted that this &#8220;desert economy&#8221; model has attracted widespread participation from local residents. Currently, the vegetation coverage rate in the project area has increased to 65%, while the rate of land desertification has decreased by 40%. It is anticipated that the average annual income per mu for villagers will increase by <span class=\"xn-money\">3,000 yuan<\/span>.<\/p>\n<p>Looking forward, the State Grid Kashgar Power Supply Company plans to promote the transformation from ecological restoration to resource utilization. Future initiatives will focus on exploring &#8220;photovoltaic + sand control&#8221; and &#8220;smart irrigation&#8221; models, leveraging electrical power to unlock the potential value of desert resources, and supporting the realization of the ecological revitalization blueprint encompassing &#8220;sand control, sand utilization, and sand enrichment.&#8221;<\/p>","protected":false},"excerpt":{"rendered":"<p><!-- wp:html --><\/p>\n<p><span class=\"legendSpanClass\">KASHGAR, <span class=\"xn-location\">China<\/span><\/span>, <span class=\"legendSpanClass\"><span class=\"xn-chron\">March 13, 2025<\/span><\/span> \/PRNewswire\/ &#8212; On <span class=\"xn-chron\">March 11<\/span>, the successful\u00a0energization of the final transformer for the Dawakun Desert Comprehensive Control Project in Yuepuhu County marked a significant milestone. The State Grid Kashgar Power Supply Company successfully completed the installation of 101 transformers with a capacity of 100 kVA each and constructed 128 kilometers of dedicated transmission lines, providing reliable power supply to 96 pumping wells. This achievement signifies key progress in the Southern Xinjiang &#8220;Sand Stabilization and Border Security&#8221; initiative.<\/p>\n<p>The large-scale sand stabilization project, situated at the border between the Dawakun Desert and Buguri Desert, commenced on <span class=\"xn-chron\">January 15<\/span>. It aims to establish ecological barriers through the construction of water-saving drip irrigation systems and the planting of drought-resistant vegetation such as Haloxylon ammodendron. The State Grid Kashgar Power Supply Company proactively aligned with government planning by forming a specialized task force to conduct preliminary investigations and tailor-made power supply solutions. A green channel was established for the entire project process, enabling same-day power delivery upon acceptance. According to <span class=\"xn-person\">Jiang Xiao<\/span>, Deputy Director of the Power Supply Department at State Grid Yuepuhu County Power Supply Company, an exclusive personnel tracking mechanism reduced the construction approval process by 60%, ensuring simultaneous advancement of sand control efforts and power infrastructure development.<\/p>\n<p>The integration of ecological governance and economic benefits has emerged as a highlight of the project. After 1-2 years of sand stabilization, the value of the desert ecosystem can be enhanced by grafting the valuable herb Cistanche onto the roots of existing plants. Each household contracts 30-50 mu of land, contributing to both sand control and income generation. Villager Ulaimu Tohti from <span class=\"xn-person\">Bayi Awati<\/span> village noted that this &#8220;desert economy&#8221; model has attracted widespread participation from local residents. Currently, the vegetation coverage rate in the project area has increased to 65%, while the rate of land desertification has decreased by 40%. It is anticipated that the average annual income per mu for villagers will increase by <span class=\"xn-money\">3,000 yuan<\/span>.<\/p>\n<p>Looking forward, the State Grid Kashgar Power Supply Company plans to promote the transformation from ecological restoration to resource utilization. Future initiatives will focus on exploring &#8220;photovoltaic + sand control&#8221; and &#8220;smart irrigation&#8221; models, leveraging electrical power to unlock the potential value of desert resources, and supporting the realization of the ecological revitalization blueprint encompassing &#8220;sand control, sand utilization, and sand enrichment.&#8221;<\/p>\n<p><!-- \/wp:html --><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"rop_custom_images_group":[],"rop_custom_messages_group":[],"rop_publish_now":"initial","rop_publish_now_accounts":[],"rop_publish_now_history":[],"rop_publish_now_status":"pending","footnotes":""},"categories":[5,7],"tags":[],"class_list":["post-19801","post","type-post","status-publish","format-standard","hentry","category-cision-pr-newswire","category-cision-pr-newswire-en"],"_links":{"self":[{"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=\/wp\/v2\/posts\/19801","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=19801"}],"version-history":[{"count":0,"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=\/wp\/v2\/posts\/19801\/revisions"}],"wp:attachment":[{"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=19801"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=19801"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=19801"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}