{"id":15061,"date":"2024-12-16T11:32:04","date_gmt":"2024-12-16T04:32:04","guid":{"rendered":"https:\/\/thaipropertynews.com\/feeds\/?p=15061"},"modified":"2024-12-16T11:32:04","modified_gmt":"2024-12-16T04:32:04","slug":"the-worlds-first-660-mw-ultra-supercritical-cfb-power-project-commences-operations","status":"publish","type":"post","link":"https:\/\/thaipropertynews.com\/feeds\/?p=15061","title":{"rendered":"The World&#8217;s First 660 MW Ultra-Supercritical CFB Power Project Commences Operations"},"content":{"rendered":"<p><span class=\"legendSpanClass\">BINCHANG, <span class=\"xn-location\">China<\/span><\/span>, <span class=\"legendSpanClass\"><span class=\"xn-chron\">Dec. 13, 2024<\/span><\/span> \/PRNewswire\/ &#8212; Developed by <a href=\"https:\/\/en.harbin-electric.com\/\" target=\"_blank\" rel=\"nofollow\">Harbin Electric Corporation<\/a>, the world&#8217;s first 660 MW high-efficiency ultra-supercritical circulating fluidized bed (CFB) power generation unit, featuring the highest specifications and largest single-unit capacity, installed in the power plant in Binchang, <span class=\"xn-location\">China<\/span>, has recently successfully completed a 168-hour full-load trial operation test, marking\u00a0a new global standard in power generation technology.<\/p>\n<div class=\"PRN_ImbeddedAssetReference\">\n<p><a href=\"https:\/\/mma.prnasia.com\/media2\/2580492\/The_No_1_Generator_Set_Binchang_Project_Shaanxi_China_successfully.html\" target=\"_blank\" rel=\"nofollow\"><img decoding=\"async\" src=\"https:\/\/mma.prnasia.com\/media2\/2580492\/The_No_1_Generator_Set_Binchang_Project_Shaanxi_China_successfully.jpg?p=medium600\" title=\"The No. 1 Generator Set of the Binchang Project in Shaanxi, China, has successfully completed a 168-hour trial operation.\" alt=\"The No. 1 Generator Set of the Binchang Project in Shaanxi, China, has successfully completed a 168-hour trial operation.\" \/><\/a><br \/><span>The No. 1 Generator Set of the Binchang Project in Shaanxi, China, has successfully completed a 168-hour trial operation.<\/span><\/p>\n<\/div>\n<p>The Binchang Project, a demonstration initiative endorsed by the Ministry of Science and Technology and the National Energy Administration, stands as a coal industry pacesetter in ecological restoration within the Yellow River Basin. It seamlessly integrates solid waste and mine water utilization with mine geological environment treatment, restoration, and land reclamation.<\/p>\n<p>Planned in two phases, the construction of two units will, upon full operation of the first phase, annually convert approximately 2 million tons of low-calorific value coal and inferior fuels such as coal slime and gangue. It will also utilize 2 million tons of mine water, and supply 6 million GJ of heat, meeting Binzhou City&#8217;s heating needs and local industrial steam demands.<\/p>\n<p>Additionally, the project will enhance regional power grid stability and electricity supply, addressing local power shortages and fostering sustained socio-economic growth.<\/p>\n<div class=\"PRN_ImbeddedAssetReference\">\n<p><a href=\"https:\/\/mma.prnasia.com\/media2\/2580493\/The_Shaanxi_Binchang_Power_Plant.html\" target=\"_blank\" rel=\"nofollow\"><img decoding=\"async\" src=\"https:\/\/mma.prnasia.com\/media2\/2580493\/The_Shaanxi_Binchang_Power_Plant.jpg?p=medium600\" title=\"The Shaanxi Binchang Power Plant.\" alt=\"The Shaanxi Binchang Power Plant.\" \/><\/a><br \/><span>The Shaanxi Binchang Power Plant.<\/span><\/p>\n<\/div>\n<p>Harbin Electric Corporation has engineered the boiler, turbine, and generator, all three core components of the Binchang project. The superior CFB boiler, crafted by Harbin Boiler Company, boasts ultra-low emissions, ultra-high parameters, and ultra-low energy consumption. This fully domestically produced boiler, with its independent intellectual property rights, represents the pinnacle of CFB boiler technology worldwide in terms of parameters and capacity.<\/p>\n<p>The ultra-supercritical indirect air-cooled reverse-flow turbine, a product of Harbin Turbine Company, is another highlight. It is a 660 MW-class turbine featuring a once-through reheat, single-axis, three-cylinder, two-exhaust design. The turbine excels in thermal performance and flow efficiency.<\/p>\n<p>Additionally, the wide-load high-efficiency generator, designed by Harbin Electric Machinery Company, offers high output, exceptional efficiency, low temperature rise, and minimal vibration. It&#8217;s designed for wide-load operation and outstanding performance under challenging conditions, such as deep peak shaving, leading phase operation, and negative-sequence operation.<\/p>\n<div class=\"PRN_ImbeddedAssetReference\">\n<p><a href=\"https:\/\/mma.prnasia.com\/media2\/2580494\/Steam_Turbine_Generator_Set_Binchang_Project_Shaanxi.html\" target=\"_blank\" rel=\"nofollow\"><img decoding=\"async\" src=\"https:\/\/mma.prnasia.com\/media2\/2580494\/Steam_Turbine_Generator_Set_Binchang_Project_Shaanxi.jpg?p=medium600\" title=\"Steam Turbine Generator Set for the Binchang Project in Shaanxi.\" alt=\"Steam Turbine Generator Set for the Binchang Project in Shaanxi.\" \/><\/a><br \/><span>Steam Turbine Generator Set for the Binchang Project in Shaanxi.<\/span><\/p>\n<\/div>\n<p>The ultra-supercritical CFB power generation technology marks a significant breakthrough under <span class=\"xn-location\">China&#8217;s<\/span> 13th Five-Year Plan. It advances high-parameter, large-capacity, and energy-efficient CFB technology, aligning with the nation&#8217;s new-era energy development objectives. This resonates with Harbin Electric Corporation&#8217;s dedication to developing new competitive advantages in sustainable, low-carbon energy technologies, and driving the creation of new productive forces to meet the challenges of the evolving energy landscape.<\/p>\n<p>Harbin Electric Corporation utilized resources from <span class=\"xn-location\">China&#8217;s<\/span> 13th Five-Year Plan to enter into partnerships with <span class=\"xn-location\">China&#8217;s<\/span> top universities, including Tsinghua, Xi&#8217;an Jiaotong, <span class=\"xn-location\">Zhejiang<\/span>, and <span class=\"xn-location\">Chongqing<\/span>.<\/p>\n<p>Through the integration of advanced technology and practical engineering, they addressed key challenges to engineer ultra-high-parameter, ultra-large CFB boiler equipment, successfully scaling up to 660 MW capacity. The boiler&#8217;s main steam pressure peaks at 29.3 MPa, equivalent to the weight of four adults standing on a nail-sized section of pipe. With a main steam temperature of 605\u00b0C and a reheat steam temperature of 623\u00b0C, it sets new international standards for CFB boiler parameters. The boiler also achieves a 95% desulfurization efficiency, enabling ultra-low emissions for large-scale CFB applications.<\/p>\n<p>Harbin Electric Corporation&#8217;s commitment to excellence has driven the Binchang project from proposal evaluation to national demonstration status under the 13th Five-Year Plan. The success of each phase, from construction and hydrostatic testing to grid connection, and commissioning, has culminated in a world-class power generation facility, boasting unprecedented parameters and performance. The successful operation of the 660 MW ultra-supercritical CFB boiler not only fills a significant gap in global technology but also cements Harbin Electric Corporation&#8217;s pioneering role in large-capacity, high-parameter CFB technology. This milestone heralds a new era of ultra-supercritical parameters for CFB boilers worldwide.<\/p>\n<div class=\"PRN_ImbeddedAssetReference\">  <\/div>","protected":false},"excerpt":{"rendered":"<p><!-- wp:html --><\/p>\n<p><span class=\"legendSpanClass\">BINCHANG, <span class=\"xn-location\">China<\/span><\/span>, <span class=\"legendSpanClass\"><span class=\"xn-chron\">Dec. 13, 2024<\/span><\/span> \/PRNewswire\/ &#8212; Developed by <a href=\"https:\/\/en.harbin-electric.com\/\" target=\"_blank\" rel=\"nofollow\">Harbin Electric Corporation<\/a>, the world&#8217;s first 660 MW high-efficiency ultra-supercritical circulating fluidized bed (CFB) power generation unit, featuring the highest specifications and largest single-unit capacity, installed in the power plant in Binchang, <span class=\"xn-location\">China<\/span>, has recently successfully completed a 168-hour full-load trial operation test, marking\u00a0a new global standard in power generation technology.<\/p>\n<div class=\"PRN_ImbeddedAssetReference\">\n<p><a href=\"https:\/\/mma.prnasia.com\/media2\/2580492\/The_No_1_Generator_Set_Binchang_Project_Shaanxi_China_successfully.html\" target=\"_blank\" rel=\"nofollow\"><img decoding=\"async\" src=\"https:\/\/mma.prnasia.com\/media2\/2580492\/The_No_1_Generator_Set_Binchang_Project_Shaanxi_China_successfully.jpg?p=medium600\" title=\"The No. 1 Generator Set of the Binchang Project in Shaanxi, China, has successfully completed a 168-hour trial operation.\" alt=\"The No. 1 Generator Set of the Binchang Project in Shaanxi, China, has successfully completed a 168-hour trial operation.\" \/><\/a><br \/><span>The No. 1 Generator Set of the Binchang Project in Shaanxi, China, has successfully completed a 168-hour trial operation.<\/span><\/p>\n<\/div>\n<p>The Binchang Project, a demonstration initiative endorsed by the Ministry of Science and Technology and the National Energy Administration, stands as a coal industry pacesetter in ecological restoration within the Yellow River Basin. It seamlessly integrates solid waste and mine water utilization with mine geological environment treatment, restoration, and land reclamation.<\/p>\n<p>Planned in two phases, the construction of two units will, upon full operation of the first phase, annually convert approximately 2 million tons of low-calorific value coal and inferior fuels such as coal slime and gangue. It will also utilize 2 million tons of mine water, and supply 6 million GJ of heat, meeting Binzhou City&#8217;s heating needs and local industrial steam demands.<\/p>\n<p>Additionally, the project will enhance regional power grid stability and electricity supply, addressing local power shortages and fostering sustained socio-economic growth.<\/p>\n<div class=\"PRN_ImbeddedAssetReference\">\n<p><a href=\"https:\/\/mma.prnasia.com\/media2\/2580493\/The_Shaanxi_Binchang_Power_Plant.html\" target=\"_blank\" rel=\"nofollow\"><img decoding=\"async\" src=\"https:\/\/mma.prnasia.com\/media2\/2580493\/The_Shaanxi_Binchang_Power_Plant.jpg?p=medium600\" title=\"The Shaanxi Binchang Power Plant.\" alt=\"The Shaanxi Binchang Power Plant.\" \/><\/a><br \/><span>The Shaanxi Binchang Power Plant.<\/span><\/p>\n<\/div>\n<p>Harbin Electric Corporation has engineered the boiler, turbine, and generator, all three core components of the Binchang project. The superior CFB boiler, crafted by Harbin Boiler Company, boasts ultra-low emissions, ultra-high parameters, and ultra-low energy consumption. This fully domestically produced boiler, with its independent intellectual property rights, represents the pinnacle of CFB boiler technology worldwide in terms of parameters and capacity.<\/p>\n<p>The ultra-supercritical indirect air-cooled reverse-flow turbine, a product of Harbin Turbine Company, is another highlight. It is a 660 MW-class turbine featuring a once-through reheat, single-axis, three-cylinder, two-exhaust design. The turbine excels in thermal performance and flow efficiency.<\/p>\n<p>Additionally, the wide-load high-efficiency generator, designed by Harbin Electric Machinery Company, offers high output, exceptional efficiency, low temperature rise, and minimal vibration. It&#8217;s designed for wide-load operation and outstanding performance under challenging conditions, such as deep peak shaving, leading phase operation, and negative-sequence operation.<\/p>\n<div class=\"PRN_ImbeddedAssetReference\">\n<p><a href=\"https:\/\/mma.prnasia.com\/media2\/2580494\/Steam_Turbine_Generator_Set_Binchang_Project_Shaanxi.html\" target=\"_blank\" rel=\"nofollow\"><img decoding=\"async\" src=\"https:\/\/mma.prnasia.com\/media2\/2580494\/Steam_Turbine_Generator_Set_Binchang_Project_Shaanxi.jpg?p=medium600\" title=\"Steam Turbine Generator Set for the Binchang Project in Shaanxi.\" alt=\"Steam Turbine Generator Set for the Binchang Project in Shaanxi.\" \/><\/a><br \/><span>Steam Turbine Generator Set for the Binchang Project in Shaanxi.<\/span><\/p>\n<\/div>\n<p>The ultra-supercritical CFB power generation technology marks a significant breakthrough under <span class=\"xn-location\">China&#8217;s<\/span> 13th Five-Year Plan. It advances high-parameter, large-capacity, and energy-efficient CFB technology, aligning with the nation&#8217;s new-era energy development objectives. This resonates with Harbin Electric Corporation&#8217;s dedication to developing new competitive advantages in sustainable, low-carbon energy technologies, and driving the creation of new productive forces to meet the challenges of the evolving energy landscape.<\/p>\n<p>Harbin Electric Corporation utilized resources from <span class=\"xn-location\">China&#8217;s<\/span> 13th Five-Year Plan to enter into partnerships with <span class=\"xn-location\">China&#8217;s<\/span> top universities, including Tsinghua, Xi&#8217;an Jiaotong, <span class=\"xn-location\">Zhejiang<\/span>, and <span class=\"xn-location\">Chongqing<\/span>.<\/p>\n<p>Through the integration of advanced technology and practical engineering, they addressed key challenges to engineer ultra-high-parameter, ultra-large CFB boiler equipment, successfully scaling up to 660 MW capacity. The boiler&#8217;s main steam pressure peaks at 29.3 MPa, equivalent to the weight of four adults standing on a nail-sized section of pipe. With a main steam temperature of 605\u00b0C and a reheat steam temperature of 623\u00b0C, it sets new international standards for CFB boiler parameters. The boiler also achieves a 95% desulfurization efficiency, enabling ultra-low emissions for large-scale CFB applications.<\/p>\n<p>Harbin Electric Corporation&#8217;s commitment to excellence has driven the Binchang project from proposal evaluation to national demonstration status under the 13th Five-Year Plan. The success of each phase, from construction and hydrostatic testing to grid connection, and commissioning, has culminated in a world-class power generation facility, boasting unprecedented parameters and performance. The successful operation of the 660 MW ultra-supercritical CFB boiler not only fills a significant gap in global technology but also cements Harbin Electric Corporation&#8217;s pioneering role in large-capacity, high-parameter CFB technology. This milestone heralds a new era of ultra-supercritical parameters for CFB boilers worldwide.<\/p>\n<div class=\"PRN_ImbeddedAssetReference\">  <\/div>\n<p><!-- \/wp:html --><\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"rop_custom_images_group":[],"rop_custom_messages_group":[],"rop_publish_now":"initial","rop_publish_now_accounts":[],"rop_publish_now_history":[],"rop_publish_now_status":"pending","footnotes":""},"categories":[5,7],"tags":[],"class_list":["post-15061","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-cision-pr-newswire","category-cision-pr-newswire-en"],"_links":{"self":[{"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=\/wp\/v2\/posts\/15061","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=15061"}],"version-history":[{"count":0,"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=\/wp\/v2\/posts\/15061\/revisions"}],"wp:attachment":[{"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=15061"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=15061"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=15061"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}