{"id":11538,"date":"2024-10-31T15:14:37","date_gmt":"2024-10-31T08:14:37","guid":{"rendered":"https:\/\/thaipropertynews.com\/feeds\/?p=11538"},"modified":"2024-10-31T15:14:37","modified_gmt":"2024-10-31T08:14:37","slug":"the-first-grid-type-energy-storage-power-station-in-kashgar-is-connected-to-the-grid","status":"publish","type":"post","link":"https:\/\/thaipropertynews.com\/feeds\/?p=11538","title":{"rendered":"The first grid type energy storage power station in Kashgar is connected to the grid"},"content":{"rendered":"<p><span class=\"legendSpanClass\">KASHGAR, <span class=\"xn-location\">China<\/span><\/span>, <span class=\"legendSpanClass\"><span class=\"xn-chron\">Oct. 30, 2024<\/span><\/span> \/PRNewswire\/ &#8212; &#8220;The test has passed, the acceptance has passed, and the conditions for power transmission are met.&#8221; At 18:00 on <span class=\"xn-chron\">October 29<\/span>, in the\u00a0photovoltaic power generation park in Shache County, Kashgar region, as the power dispatching control center of the <b>State Grid Kashgar Power Supply Company<\/b> ordered the closing of the 35 kV <span class=\"xn-location\">Guangdong<\/span> stack storage light 11 line 3522 circuit breaker, the first grid-type energy storage power station in Kashgar region was connected to the grid for operation<span>. T<\/span>he installed photovoltaic capacity exceeds 7 million kilowatts<span>.<\/span><\/p>\n<p>Guangdong Energy and light Storage Integration Project, invested by Yudian Shache Comprehensive Energy Co., LTD., is the first grid type energy storage power station in Kashgar power grid.<span> To<\/span> ensure <span>a<\/span> smooth operation <span>in<\/span> this power station, the State Grid Kashgar Power Supply Company arranges special personnel to verify the construction progress of the new energy station to be put into operation every week<span>. It also<\/span> evaluates the planned grid-connection time according to the on-site construction situation and progress of the photovoltaic projec<span>t. Furthermore, it <\/span>builds a comprehensive one-stop quality service from the whole process of grid-connection policy consultation, grid-connection business data demand list, agreement contract signing, etc. <span>The State Grid Kashgar Power Supply Company <\/span>ensures the smooth grid connection of new energy power generation enterprises and the safe and stable operation of the power grid.<\/p>\n<p><span>Moving forward, t<\/span>he State Grid Kashgar Power Supply Company will continue <span>working on<\/span> grid-connected services <span>and<\/span> electricity management of government departments.<span> It aims to p<\/span>romote the production and consumption of new energy <span>and to <\/span>practice the ecological concept of &#8220;green, low-carbon and environmental protection&#8221; <span>effectively<\/span>.\u00a0<span>The State Grid Kashgar Power Supply Company is anticipated to <\/span>build a new power system with new energy as the main body <span>and<\/span> promote green transformation <span>effectively<\/span>.<\/p>","protected":false},"excerpt":{"rendered":"<p><!-- wp:html --><\/p>\n<p><span class=\"legendSpanClass\">KASHGAR, <span class=\"xn-location\">China<\/span><\/span>, <span class=\"legendSpanClass\"><span class=\"xn-chron\">Oct. 30, 2024<\/span><\/span> \/PRNewswire\/ &#8212; &#8220;The test has passed, the acceptance has passed, and the conditions for power transmission are met.&#8221; At 18:00 on <span class=\"xn-chron\">October 29<\/span>, in the\u00a0photovoltaic power generation park in Shache County, Kashgar region, as the power dispatching control center of the <b>State Grid Kashgar Power Supply Company<\/b> ordered the closing of the 35 kV <span class=\"xn-location\">Guangdong<\/span> stack storage light 11 line 3522 circuit breaker, the first grid-type energy storage power station in Kashgar region was connected to the grid for operation<span>. T<\/span>he installed photovoltaic capacity exceeds 7 million kilowatts<span>.<\/span><\/p>\n<p>Guangdong Energy and light Storage Integration Project, invested by Yudian Shache Comprehensive Energy Co., LTD., is the first grid type energy storage power station in Kashgar power grid.<span> To<\/span> ensure <span>a<\/span> smooth operation <span>in<\/span> this power station, the State Grid Kashgar Power Supply Company arranges special personnel to verify the construction progress of the new energy station to be put into operation every week<span>. It also<\/span> evaluates the planned grid-connection time according to the on-site construction situation and progress of the photovoltaic projec<span>t. Furthermore, it <\/span>builds a comprehensive one-stop quality service from the whole process of grid-connection policy consultation, grid-connection business data demand list, agreement contract signing, etc. <span>The State Grid Kashgar Power Supply Company <\/span>ensures the smooth grid connection of new energy power generation enterprises and the safe and stable operation of the power grid.<\/p>\n<p><span>Moving forward, t<\/span>he State Grid Kashgar Power Supply Company will continue <span>working on<\/span> grid-connected services <span>and<\/span> electricity management of government departments.<span> It aims to p<\/span>romote the production and consumption of new energy <span>and to <\/span>practice the ecological concept of &#8220;green, low-carbon and environmental protection&#8221; <span>effectively<\/span>.\u00a0<span>The State Grid Kashgar Power Supply Company is anticipated to <\/span>build a new power system with new energy as the main body <span>and<\/span> promote green transformation <span>effectively<\/span>.<\/p>\n<p><!-- \/wp:html --><\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"rop_custom_images_group":[],"rop_custom_messages_group":[],"rop_publish_now":"initial","rop_publish_now_accounts":[],"rop_publish_now_history":[],"rop_publish_now_status":"pending","footnotes":""},"categories":[5,7],"tags":[],"class_list":["post-11538","post","type-post","status-publish","format-standard","hentry","category-cision-pr-newswire","category-cision-pr-newswire-en"],"_links":{"self":[{"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=\/wp\/v2\/posts\/11538","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=11538"}],"version-history":[{"count":0,"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=\/wp\/v2\/posts\/11538\/revisions"}],"wp:attachment":[{"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=11538"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=11538"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/thaipropertynews.com\/feeds\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=11538"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}